Good Energy.
Ahead of Schedule.

The grid has a five-year queue. This site doesn't use it.

Where are you coming from?
For Data Center & Compute Operators

Your campus.
Your power.
No utility between you and uptime.

Every hyperscale operator in the Southwest is hitting the same wall: the grid can't commit capacity fast enough. This is a private generation site. Your load. Your contract. Your timeline.

  • ~1,220
    MW
    ~1,220 MW at full buildout. Starts at 50 MW. You don't have to take the whole site.
  • 3 SRCNatural gas, solar + thermal storage, and geothermal — balanced by battery storage. 24/7 baseload, not weather-dependent.
  • 0
    queue
    Private land. No interconnection queue. Under 10 MW ties directly to El Paso Electric. Larger loads bypass the utility backlog.
  • 15
    miles
    Meta's hyperscale campus is 15 miles out. Fort Bliss is next door. The load is already there.
Reach the Team

Reviewed directly by the Blacktail team.

For Capital & Investment

Private land.
Verified science.
One of a kind in the Borderplex.

4,480 acres of private land. Three energy sources. A geothermal gradient you don't find this close to existing transmission. It's not on a listing site because it's not that kind of deal.

  • 4,480
    acres
    Contiguous private land — no BLM, no federal permitting delays, no surface-use conflicts.
  • 309°
    C/km
    Geothermal gradient independently verified by New Mexico Tech, November 2024. Among the strongest identified in the region since UTEP's 1981 study.
  • PHASE50 MW pilot to ~1,220 MW nameplate. Built for phased capital — you pick where you come in.
  • 2027
    online
    Pilot online 2027. Permits filed. Partners under contract. This isn't a concept deck.
Reach the Team

Reviewed directly by the Blacktail team.

For Infrastructure Developers & Operators

Built to move.
The permits prove it.

No federal clock. Private land means no BLM, no state agencies in the way. Agreement to ground in weeks, not years.

  • 3–7
    days
    Private-property drilling permits in Texas — not months on federal or state land.
  • 2×30″El Paso Natural Gas pipelines already cross the property. Interconnection is underway.
  • H₂OTwo water sources on-site — subsurface volume and recharge-rate studies underway with UT El Paso.
  • MOUSigned MOU with RayGen for initial solar + thermal storage deployment: 20–30 MW ORC, 40–50 MW PV Ultra.
Reach the Team

Reviewed directly by the Blacktail team.

What Good Energy Means

As geothermal grows here,
the region grows with it.

The energy business has a long history of showing up, taking what it came for, and leaving town with it. Good Energy is our answer — a deliberate effort to build local capacity, so that as geothermal development expands across the Borderplex, more of the work, the skills, and the economic benefit stay in the communities that host it.

  • Local hiring, on purposeThe people who pour the concrete, run the wellheads, and keep this site online should come from the Borderplex. We write that priority into scopes early, rather than treating it as a leftover.
  • A clear pathway inLocal contractors and suppliers get a straight line to what's coming — upcoming needs, readiness requirements, and how to engage. Early interest doesn't guarantee a contract, but it puts you in the room while the work is still being defined.
  • It scales as we scaleThis starts with first wells and is built to become repeatable field operations. As it grows, the regional workforce and supplier base grow with it, so the capacity we build now compounds over time.
  • The benefit staysThe power firms up the grid for local industry, data centers, and Fort Bliss, and the return stays with the communities doing the work — instead of leaving town with the rig.
The Founders
Joe Navar
Joe Navar
Founder & CEO

Joe started Blacktail in June 2022. Within 18 months its geothermal wellhead systems were running in the U.S., Guatemala, Kenya, and the Philippines. He began as Lead Wellhead R&D Engineer at Cameron, a Schlumberger company, bringing new API 6A wellhead technology to market, then ran the Artificial Lift business at The Weir Group. He built Mesquite Technologies, grew it 489%, raised $1.5M in seed and Series A, and sold its hardware and software to NOV in 2024. MBA from Rice. B.S. in Mechanical Engineering from UT Austin.

Timothy Phythian
Timothy Phythian
Co-Founder & COO

Tim runs operations, engineering, and project development. For more than a decade he has built equipment that has to hold up in the field — pressure-control systems, wellhead equipment, and modular power — across oil and gas, geothermal, and distributed power. At Blacktail he leads the geothermal wellhead technology and the modular Organic Rankine Cycle (ORC) power concepts, and owns how a project moves from engineering to built.

Reach the Team

Reviewed directly by the Blacktail team.

Core Updates

Core Updates

Explore geothermal insights from partner studies, industry research, and company press releases.

Press Release · For Immediate Release

Blacktail Energy and RayGen Execute Strategic Agreement to Advance Multi-Asset Hybrid Power Project in El Paso, TX

Collaboration targets an initial 20–30 MW ORC and 40–50 MW PV Ultra deployment within a contemplated 1,220 MW hybrid energy hub, integrating geothermal, solar, long-duration storage, and natural gas under Blacktail's #GoodEnergy commitment.

As the Borderplex region experiences surging power demand driven by Fort Bliss, residential users, and an emerging data centre corridor, Blacktail Energy Holdings Inc. (“Blacktail”) has executed a strategic Memorandum of Understanding with RayGen Resources Pty Ltd (“RayGen”). The agreement establishes a framework to integrate RayGen's photovoltaic (PV Ultra) and long-duration thermal storage (Thermal Hydro) technologies with Blacktail's power platform at the 4,480-acre Blacktail Acreage in El Paso County, Texas.

The acreage is being developed by Blacktail as a multi-technology hybrid energy hub with a total contemplated generation capacity of approximately 1,220 MW across geothermal, solar, long-duration storage, and natural gas. The site benefits from 4,480 contiguous acres of privately held land, significant geothermal potential, abundant solar viability, existing natural gas pipeline access, and proximity to Fort Bliss and the broader tri-city Borderplex region of over 2.5 million people.

“The Borderplex region requires firm, reliable, and clean energy to support critical defense assets, residential growth, and emerging data centre developments,” said Joe Navar, Chief Executive Officer of Blacktail Energy. “By combining our geothermal development program and Organic Rankine Cycle power generation capabilities with RayGen's PV Ultra and Thermal Hydro storage, we are engineering a differentiated, multi-asset generation asset. Under our #GoodEnergy campaign, we are committed to building infrastructure that strengthens regional power reliability, prioritizes local economic participation, and creates durable value for our community and investors.”
RayGen Chief Executive Officer, Richard Payne, added, “RayGen's PV Ultra and Thermal Hydro technologies were built to deliver dispatchable renewable power wherever the grid needs it most, and the Blacktail Acreage's strong solar resource and position adjacent to growing industrial and urban demand make it an ideal place to demonstrate that value. Blacktail's geothermal and ORC expertise is highly complementary to our storage and generation platform, enabling a unique technical integration between the two systems. We're pleased to be working with a partner as committed to disciplined execution and community benefit as we are, and we look forward to advancing this project toward financial close.”

Under the agreement, a Joint Technical Working Group will examine key integration and shared asset utilization opportunities, including:

  • Domestic ORC Package Supply and Integration: Exploring Blacktail leading the supply and integration of Organic Rankine Cycle (ORC) systems into RayGen's plant at the Blacktail Acreage, leveraging Blacktail's ORC supply chain and integration capabilities.
  • Secondary Heat Re-Use: Utilizing secondary heat from the geothermal resource as a supplemental thermal input to boost overall efficiency for RayGen's integrated power plant.
  • Dual Cold Reservoir Utilisation: Utilizing RayGen's cold reservoir as a temperature sink for Blacktail's wider geothermal resource to improve constancy and operating efficiency.
  • Initial Phased Deployment: Advancing engineering for an anticipated initial RayGen deployment comprising approximately 20–30 MW of ORC capacity and 40–50 MW of PV Ultra capacity, with the potential to scale alongside the broader Hybrid Power Project.

Local Alignment and the #GoodEnergy Standard

Blacktail's #GoodEnergy framework ensures that utility-scale infrastructure development delivers direct, lasting benefits to the host community and regional economy:

  • Regional Economic Participation: Establishing structured visibility into technical and civil scopes to ensure local and regional contractors participate directly in project development.
  • Grid and Mission-Critical Power Security: Providing bulk renewable energy, power firming, and constraint alleviation to support regional industrial growth, data centre development, and Fort Bliss without burdening municipal utility infrastructure.
  • Responsible Resource Development: Leveraging high-efficiency thermal hydro storage and closed-loop geothermal cycles to deliver dispatchable power while respecting regional land and environmental resources.
  • Workforce Mobilization: Creating long-term technical and operational opportunities for the region's skilled mechanical, subsurface, and energy workforce.
“#GoodEnergy means building critical infrastructure with the community and for the community,” added Navar. “Through this partnership, we are accelerating project development toward financial close and construction, providing a clear path to deliver synchronous, high-quality power ahead of schedule.”

About Blacktail Energy Holdings Inc.

Blacktail Energy Holdings Inc. accelerates the geothermal energy transition by delivering equipment, services, and project execution from spud to power. The company specializes in geothermal wellhead systems, stimulation and surface equipment, and Organic Rankine Cycle (ORC) power solutions, integrating engineering, procurement, and field services to shorten development timelines, reduce project risk, and build reliable, grid-ready geothermal capacity for owners and developers, focusing on predictable plant performance and faster paths to revenue.

Good Energy. Ahead of schedule.

About RayGen Resources Pty Ltd

RayGen Resources Pty Ltd is an Australian technology business with world-leading capability in the next generation of solar power and energy storage. RayGen's Solar Power Plant makes renewable energy available on demand. The integrated long-duration storage solution uses no critical minerals and extends at low cost to offer 48 hours+ continuous dispatch via synchronous engine, providing high-quality power at utility-scale. The system can be flexibly located and installed where the grid requires, combining RayGen's proprietary PV Ultra (solar co-generation) and Thermal Hydro (electro-thermal storage) technologies. Thermal products, such as firmed closed-loop cooling for adjacent data centres, underpin additional value offered by the system. Key investors in RayGen include SLB, Equinor, Quanta, Oxy, Chevron, AGL and Innovation Victoria.

Media & Investor Relations Contact

April Vasquez, Growth Marketing Director
Blacktail Energy Holdings Inc.
Email: [email protected]

Good Energy. Ahead of Schedule.·Blacktail Southwest · El Paso County, TX·Energy Innovation Collaborators: UT Austin · UT El Paso · NM Tech · SLB · RayGen · NOV